4th semester · Five-storey office building

Office Building · Reused Materials

Model responsibility, LCA, authority documentation and tender material for a circular office-building proposal.

Spring 2025Taastrup, Denmark
Office Building · Reused Materials

Revit model responsibility and tender package

Concept to authority project and tendering

Project and context

Our team developed a supplied concept for a five-storey office building with EU Taxonomy and reuse requirements. The target was a maximum climate impact of 6.1 kg CO₂e/m²/year in 2029, with at least 30% reused concrete and 70% reused metals.

My contribution

Built and maintained the Revit model and produced plans, sections and details.

Reviewed a donor-building slab plan to identify reusable materials.

Completed LCA calculations in LCAbyg and coordinated project documentation.

Prepared authority drawings, drawing lists and a construction-site logistics plan.

Prepared tender material for stairs, toilets, lift and atrium façades, including NBS Nordic descriptions.

Selected project evidence

Office Building · Reused Materials

Donor-building review workflow
Review process used to identify and document reusable elements.
Office-building atrium elevation
Technical elevation showing the atrium and escape stair.
Stair tender drawings
Stair plans, sections and 3D documentation from the tender package.

What this demonstrates to an employer

Model ownership
Sustainable design decisions
Authority documentation
Tender-package coordination

Tools

RevitLCAbygNBS NordicMS ProjectSigmaSmartSite